Torque for bus bar lugs is specified by lug size.
Electrical bus bar torque specs.
Up facilities engineering electrical interior facilities.
All of the major companies who manufacture electrical components have torque specifications for their equipment ask for it.
Typical busway installation.
Diameter of bolt used should be compatible with hole in tang.
Knowing required ampacity determine possible bus bar dimensions from the table.
Importance of torque in bussing a critical concept in understanding bus lug torque specifications is the fact that the pressure of the lug connection has more to do with lowering the resistance of the electrical connection than the size of the lug itself.
The most common size used is 1 2 13 but 5 8 11 hardware is used for some very large joints and sizes.
Bus bar and terminal connections.
For 60 hz current table gives bus bar cross sections which will probably be large enough for ampacities within each range.
Use the torque specifications in.
Ensure your electricians own and know how to use a torque wrench.
Zinc plated to retard corrosion and installed with the proper torque this hardware has a long history of satisfactory performance with both copper and aluminum bus bars.
Ensure you know the torque specification.
Then check table 1 to verify that size selected has the necessary ampacity.
Reduce torque by 20 when cadmium plated bolts are used.
Have the bus bars cleaned annually with clean dry.
882 853 3 way bus bar 876 199 terminal mount 901 325 red cover 3x m8 nuts assembly instructions place the battery terminal on the stud bus bar assembly for 2 positions bolt the two pieces together place z case fuses over standard fuse sizes.
Typical hardware for bolting listed lugs to bus bars.
Hexagonal bolt grade minimum sae grade 2 unc coarse thread.
I am a firm believer in using manufacture torque requirements i have been in the mining industry as electrical troubleshooter for 30 years and over 90 of failures caused by tightening methods i also will move the wire around and torque again this has proven to help in maintaining torque specs when wires are moved into position to close cabinet.
Connections can create electrical noise power quality issues by vibrating and creating arc at the connection.
Ul test assembly procedures ul486a b.